Rough walls transformed into smooth, paintable surfaces. Proper skimming throughout Radford — surfaces assessed correctly, prepared thoroughly, finished to standards that show under any light.
Posting skimming jobs online generates responses but not necessarily the right ones. Some quote low to win work then find extras, others quote high hoping you won’t check. Working directly with an established tradesman avoids the games.
There’s a better way to find a plasterer.
Radford has one dedicated plasterer handling skimming. Direct contact means no delays — you speak to the tradesman who’ll assess your walls, provide honest pricing, and deliver professional results.
Skim coat requirements differ between properties and rooms. Bathrooms following re-tiling need different prep than living rooms after wallpaper removal, and each situation benefits from experienced professional assessment and appropriate technique.
Have a read through the service details below. If it sounds like the right fit for your rooms, give us a call or fill in the form. If it’s not quite what you need, that’s fine — appreciate you taking the time.
Smooth wall skimming transforms problem surfaces into professional-quality finishes ready for decoration. Cracks, bumps, old repairs, and textured plaster all disappear beneath expertly applied skim coats. Experienced plasterers prepare surfaces properly, work methodically through each wall, and deliver consistent results — flat, smooth finishes that make decorating effortless and results impressive.
Quality ceiling re-skimming eliminates dated textures and creates fresh, smooth finishes throughout your property. Swirl patterns, stipple coatings, and damaged plaster respond to professional skimming that delivers flat overhead surfaces. Experienced plasterers handle ceiling work efficiently — proper technique, consistent results, lasting quality — rooms transformed by smooth, modern ceilings.
Professional plaster patching restores damaged sections to original condition without disrupting entire walls. Holes, cracks, and impact damage get filled, prepared, and skim coated to match surrounding surfaces exactly. Skilled blending and feathering ensure repairs become invisible — cost-effective fixes that deliver seamless results ready for any decorative finish.
New build plastering finishes fresh plasterboard to smooth, decoration-ready surfaces throughout your property. Extensions, conversions, and new construction all require professional taping, jointing, and skim coating to create seamless walls and ceilings. Experienced plasterers prepare boards correctly, tape joints invisibly, and apply quality skim coats — delivering flawless finishes that make new spaces feel complete.
Full room skimming creates fresh, unified spaces with consistent smooth finishes across all surfaces. Comprehensive coverage ensures walls and ceilings match perfectly — no texture variations, no patchy areas, just seamless results throughout. Professional plasterers transform rooms completely, delivering even quality that makes decorating effortless.
Walls that look smooth wet can show every flaw once painted. Here’s how we ensure finishes stay flat under any light throughout Radford.
From Forest Recreation Ground to Arboretum and out to Radford Boulevard, we’ve worked on Radford’s full housing range. That teaches you what preparation to expect before arriving — which areas have solid walls, where to expect blown plaster, what the original builders used.
New plasterboard drinks moisture unevenly, old lime plaster grabs too fast, painted surfaces reject bonding — preparation solves each problem differently. Skimming success across Radford starts with understanding what you’re coating.
Typical Radford homes feature victorian terrace and converted flats construction, 2.6m to 2.9m (8.5ft – 9.5ft) ceiling heights. Years working on this exact property mix means preparation becomes intuitive — recognising conditions that cause problems and addressing them automatically.
Your enquiry connects directly to the plasterer serving Radford — someone who can discuss surface conditions knowledgeably and explain why some walls need more preparation than others. Real trade conversation from the first contact.
They’ll ask about existing conditions — wall types, current finishes, room layouts, any visible problems. This information shapes the site visit, which gets scheduled for convenient timing to properly assess preparation needs and provide clear pricing.
Site visits mean proper surface evaluation — checking adhesion, testing suction, spotting failures, assessing previous work. Preparation requirements get explained clearly. Pricing based on what your walls genuinely need, not generic assumptions.
Skimming follows correct sequence — preparation, coating, finishing. Work areas receive adequate protection throughout. Thorough tidying happens after completion. Clear guidance addresses drying stages, mist coat timing, and realistic decoration readiness timelines.
Walls and plastering raise plenty of questions — how long it takes, what preparation involves, when you can paint. Here’s the straight answers to what most people ask about skimming.
Skimming a standard room takes roughly a day on walls in reasonable condition. Poor surfaces needing bonding, repairs, or extensive preparation add significant time. Ceilings alongside walls extend the schedule. Accurate duration estimates follow from proper wall assessment.
Existing surface quality determines preparation. Well-bonded plaster takes skim coats directly after keying. Problem areas — hollow sections, loose coats, thick buildup — need stripping first. Assessment reveals genuine requirements rather than guessing.
Skim finishing applies thin coats — 2-3mm typically — over existing plaster to create smooth walls. Plastering encompasses heavier applications: base coats, render work, building depth. Most domestic work involves skimming existing surfaces rather than full replastering systems.
Paint type and thickness matter. Light matt emulsion on sound plaster skims after proper keying. Heavy paint buildup, gloss finishes, or silk coatings prevent adequate bonding — typically requiring stripping or specialist treatment. Assessment determines your wall requirements.
New plaster needs drying time before paint. Surface usually appears dry within 2-4 days, but complete curing takes 2-3 weeks depending on thickness and ventilation. Mist coat with watered-down emulsion before proper painting — rushing risks adhesion failures.
Fill out the form or call now to speak directly to the plasterer covering your area. No call centres, no delays – just clear answers and fast action.
Your details are safe – we only use them to respond to your enquiry
Skimming work extends across the complete Radford region. Local expertise in housing stock characteristics, wall behaviours, and preparation methods that deliver proper results on these surfaces.