Smooth finishes that last start with understanding the surface beneath. Proper skimming throughout Hilton — walls assessed, prepared correctly, coated evenly, finished while timing allows.
Skimming quotes vary wildly across platforms because pricing depends on who needs the work. You end up comparing apples with oranges while plasterers compete on price rather than quality. One reliable tradesman with fair, consistent rates makes more sense.
We work on trusted connections.
One experienced plasterer covers skimming work across Hilton. Direct contact eliminates platform delays — you speak to the tradesman who’ll actually transform your walls into smooth, paintable surfaces.
Skim plastering covers diverse situations. Kitchen refreshes after tile removal differ from bedroom re-skims, and each room presents unique challenges — proper evaluation ensures appropriate methods and smooth, consistent results.
See what we handle below and decide if we’re the right people for your job. If yes, contact us and we’ll get things moving. If no, that’s completely fine — thanks for checking.
Professional wall re-skimming solves surface problems that paint alone can’t fix. Rough textures, visible repairs, and uneven plaster need proper skim coating to create smooth, consistent walls. Skilled tradesmen assess conditions, prepare surfaces correctly, and apply quality finishes that hide imperfections completely — delivering walls ready for any decorative treatment you’re planning.
Ceiling skimming creates smooth, flat overhead surfaces that transform how rooms look and feel. Textured ceilings, Artex patterns, and damaged plaster disappear beneath professional skim coats applied by experienced plasterers. Working overhead requires specific technique — consistent coverage, proper drying between coats, and seamless finishing — delivering ceilings that reflect light evenly and make rooms feel fresh and modern.
Seamless plaster repairs require skilled blending technique that makes patches invisible on finished walls. Damage from removed fittings, accidental impacts, and minor cracking gets properly prepared and skim coated to match existing surfaces. Professional plasterers understand feathering, texture matching, and finishing — delivering repairs that disappear completely under paint or wallpaper.
New build plastering finishes fresh plasterboard to smooth, decoration-ready surfaces throughout your property. Extensions, conversions, and new construction all require professional taping, jointing, and skim coating to create seamless walls and ceilings. Experienced plasterers prepare boards correctly, tape joints invisibly, and apply quality skim coats — delivering flawless finishes that make new spaces feel complete.
Whole room re-skimming delivers total transformation with consistent professional finishes everywhere. Walls and ceilings receive complete attention — unified textures, even coverage, quality results from floor to ceiling. Experienced tradesmen work systematically, creating smooth surfaces that renew entire rooms and make decorating straightforward.
Flat ceilings show bad walls. Flat walls show bad ceilings. Here’s why we finish both to the same standard throughout Hilton.
Properties near Kings College tend toward solid nine-inch walls with lime plaster. Toward St Machars Cathedral you hit more cavity construction with gypsum. Out near Cruickshank Botanic Garden the estates are mostly board. Knowing Hilton’s building history makes preparation instinctive.
Victorian solid walls with three previous skim coats, 1970s Artex hiding who-knows-what, plasterboard fitted yesterday — all need different approaches. Assessment across Hilton determines preparation, preparation determines finish quality.
Hilton properties feature mainly historic townhouses and victorian villas, ceilings around 2.7m to 3.5m (8.9ft – 11.5ft). That housing consistency means we’ve solved the same problems repeatedly — knowledge that transfers directly to your walls.
When you get in touch, the tradesman answers — same person who’ll assess your surfaces and apply the skim coats. Conversations about wall condition, preparation needs, and finishing standards happen with someone qualified to give proper answers.
Initial chat covers what you’re dealing with — wall condition, finish requirements, known issues. The plasterer uses this to understand scope, then arranges assessment at convenient timing for thorough surface evaluation and detailed pricing.
Site visits involve genuine wall inspection — checking for blown plaster, assessing suction, noting previous repairs, identifying preparation requirements. You’ll understand what needs doing before skimming starts. Quotes reflect actual surface condition and realistic preparation time.
Skimming follows correct sequence — preparation, coating, finishing. Work areas receive adequate protection throughout. Thorough tidying happens after completion. Clear guidance addresses drying stages, mist coat timing, and realistic decoration readiness timelines.
Before plastering starts, most people want the same information — preparation, timelines, decoration timing. Here’s the clear, simple detail.
Timing reflects what walls need, not just room dimensions. Straightforward bedroom re-skim takes a day. Surfaces requiring extensive preparation — bonding, repairs, strip-back — take longer. Ceilings add time. Accurate estimates follow proper surface inspection.
Not always — it depends on existing surface condition. Sound plaster that’s firmly attached just needs keying and coating. Blown plaster that sounds hollow when tapped needs removing. Multiple previous coats building thickness sometimes require stripping. Assessment determines what your specific walls need — some skim straight over, others need work first.
Skim coats are thin finish layers — 2-3mm typically — applied over existing surfaces to create smooth walls. Plastering covers heavier applications including base coats on masonry, render work, or building depth. Most domestic work involves skimming existing plaster rather than full replastering.
Paint type affects adhesion significantly. Light matt emulsion can receive skim after surface keying. Gloss finishes, silk coatings, or thick paint layers prevent proper bonding — typically requiring removal or specialist preparation. Assessment determines the right approach for your surfaces.
Standard skimming dries surface-ready within 2-4 days typically, though full curing extends to 2-3 weeks. Mist coat application first — watered-down matt emulsion sealing porous surfaces — then proper decoration. Insufficient drying causes paint failures.
Fill out the form or call now to speak directly to the plasterer covering your area. No call centres, no delays – just clear answers and fast action.
Your details are safe – we only use them to respond to your enquiry
Services extend throughout Hilton for quality plastering. Local understanding of housing stock, original construction types, and preparation methods that achieve smooth, lasting finishes.