Walls ready for anything — paint, paper, whatever you’re planning. Quality skimming throughout The Shore that starts with proper assessment and ends with surfaces that perform.
The multi-quote model treats skimming like a commodity when it’s actually craftsmanship. Price comparison ignores skill differences that show up in the finish. Direct contact with a quality-focused plasterer gets better walls, not just cheaper quotes.
There’s a clearer route to great finishes.
The Shore has one dedicated plasterer handling skimming. Direct contact means no delays — you speak to the tradesman who’ll assess your walls, provide honest pricing, and deliver professional results.
Skimming addresses different wall and ceiling conditions. New plasterboard finishing differs from renovation re-coating, and each surface type requires appropriate preparation — proper evaluation ensures smooth, lasting results ready for any decorative finish.
Read what we do below and work out if it fits your project. If it sounds right, call or send a message. If it’s not quite the service you need, no hard feelings.
Re-skimming walls creates the perfect foundation for any decorative finish you’re planning. Old plaster, damaged surfaces, and uneven textures disappear beneath smooth skim coats applied by experienced local plasterers. Proper technique ensures consistent coverage, clean edges, and durable results — walls transformed from rough to ready, making your decorating project straightforward.
Re-skimming ceilings eliminates textured patterns that date properties and make decorating difficult. Stipple, swirl, bark, and other Artex finishes vanish beneath professional skim coats, leaving smooth surfaces ready for paint. Skilled ceiling work requires experience — working overhead, managing drying times, avoiding joins — delivering flat finishes that transform room appearances.
Blending patch repairs into existing plaster takes skill that professional plasterers develop over years. Visible damage gets properly filled, keyed, and skim coated with careful attention to edges and texture matching. Seamless feathering ensures patches disappear completely — walls restored to consistent smooth finishes ready for decoration without full re-skimming costs.
Finishing new plasterboard creates the smooth walls your extension or conversion deserves. Professional taping hides joints invisibly, while quality skim coats deliver decoration-ready surfaces throughout. Skilled plasterers work systematically — proper preparation, consistent application, clean finishing — transforming raw boards into flawless living spaces ready for decorating.
Full re-skim plastering transforms tired rooms into fresh, modern spaces with consistent finishes throughout. Walls and ceilings receive complete coverage — no patching, no texture mismatches, just smooth surfaces everywhere. Skilled plasterers work room by room, delivering unified results that make decorating straightforward and rooms feel completely renewed.
Good preparation makes good finishes possible. Here’s how we approach every skimming job throughout The Shore — from first assessment to final polish.
From solid walls near Leith Links Park to cavity construction around Restalrig Railway Path and board systems toward Links Place, we’ve worked on The Shore’s full housing spectrum. That experience builds preparation instincts that speed assessment and prevent mistakes.
Walls after wallpaper stripping that stripped plaster too, ceilings with nicotine staining beneath, patches where old and new plaster meet — problem surfaces need solving before skimming starts. We find the problems first throughout The Shore.
Most The Shore homes are victorian tenements or edwardian terraced with 2.8m to 3.3m (9.2ft – 10.8ft) ceilings. Working continuously on these property types develops pattern recognition — spotting preparation requirements quickly based on accumulated experience.
Your message connects straight to the local plasterer — someone who can talk sensibly about existing surfaces, preparation requirements, and what’s actually involved in achieving smooth walls. No script readers, just trade knowledge.
They’ll ask practical questions — what’s on the walls now, how many rooms, any known problems. Assessment timing gets arranged based on availability, ensuring proper site evaluation before providing detailed quotations.
Site visits involve systematic surface reading — checking soundness, testing absorption, identifying weak spots, noting previous repairs. Preparation needs get explained clearly. Pricing matches actual wall condition, not generic estimates.
Work gets completed to standard — proper preparation stages, quality application, careful finishing technique. Dust sheets go down, cleanup follows completion. You’ll know about drying requirements, mist coat application, and when surfaces are ready for full decoration.
Most people ask similar things before booking — what preparation’s needed, how long work takes, when decorating can start. Direct answers below.
A day covers most bedroom skimming when surfaces behave. Walls requiring bonding, extensive repairs, or previous coat removal add significant time. Ceilings alongside walls extend schedules. You’ll receive realistic duration estimates after wall assessment.
Stripping depends on what’s there already. Firmly attached plaster in good condition skims over directly. Hollow-sounding blown areas need removing. Thick multi-coat buildup sometimes requires stripping back. Wall assessment reveals which approach your surfaces need.
Skim finishing applies thin coats — 2-3mm typically — over existing plaster to create smooth walls. Plastering encompasses heavier applications: base coats, render work, building depth. Most domestic work involves skimming existing surfaces rather than full replastering systems.
Paint condition affects preparation significantly. Matt emulsion over good plaster takes skim after proper keying. Gloss finishes, silk coatings, or thick paint layers prevent adequate adhesion — typically requiring removal or bonding treatment. Assessment determines your needs.
Allow proper drying before decoration — typically 2-4 days for surface drying in ventilated rooms, though full curing takes weeks. Apply mist coat first using diluted matt emulsion — this seals porous new plaster for proper paint adhesion. Decorating too early causes problems.
Fill out the form or call now to speak directly to the plasterer covering your area. No call centres, no delays – just clear answers and fast action.
Your details are safe – we only use them to respond to your enquiry
Coverage includes all locations throughout The Shore. Quality finishes from plasterers who understand local properties — construction eras, surface types, preparation requirements — not guesswork.